Last month I posted a list of our terminal numbers that was put together using whatever information was available at that time, and a bit of common sense. But a few days ago, the Civil Aviation Authority released the official list of terminal numbers and the list I put together was pretty much on point.
When I posted my list there was a bit of a disagreement with the Terminal 3 name. I had used it for the Sheikh Saad Terminal but a reader noted that it was most likely reserved for the expansion of Terminal 2. I did a bit of research and turns out that was a possibility since the only time Terminal 3 was ever mentioned online was when they mentioned the Terminal 2 mirror expansion. Well now looks like that’s not the case and Sheikh Saad Terminal is actually going to use the Terminal 3 name.
Check out the official list of terminals below along with the descriptions by the Civil Aviation Authority:
Terminal 1 – Main Terminal
Terminal 2 – New Terminal (Under Construction)
Terminal 3 – Sheikh Saad Terminal (General Aviation)
Terminal 4 – Kuwait Airways Passenger Terminal
Terminal 5 – Jazeera Airways Passenger Terminal
2 replies on “Official Airport Terminal Numbers”
I am sure your previous post stirred things ups, before it they were sleeping :))))
You’re mistaken. Those were all planned months ago.